AB 36: Design-build contracting: Town of Paradise

*Passed* AB 36 would help the Town of Paradise recover from the devastating impacts of the Camp Fire by authorizing the use of the design-build project delivery method for a water pipeline and a sewer treatment project.  These are critical infrastructure projects that will provide essential services while increasing fire resiliency.